Full Pool Replumb — Ramona
Complete replumb of a 1980s pool system. New main drains, returns, skimmer lines, and equipment pad plumbing — all brought up to current code.
This older pool had original galvanized plumbing that had corroded over decades. We trenched and replaced all underground lines with schedule 40 PVC, installed new main drains with anti-entrapment covers, and replumbed the entire equipment pad.